Monday, 3rd March 2008
Dubai, UAE
Lester Partridge, AECOM outlined the strategies and design processes undertaken for refurbishing a 30 storey building at the CTBUH 8th World Congress in Dubai. The building, located in Sydney's CBD, was originally constructed in 1976 and consists of 35,500 sq.m. commercial net lettable area over 30 floors with ground floor retail tenancies. The building underwent a major facade and services refurbishment in 1996. A scope of works was developed in 2006 with the aim of reducing the base building systems greenhouse gas emissions from 141 kg C02 to 87 kg C02.
Run Time: 15:25
|