Jul9Written by:host
7/9/2010 2:36 PM 
 |
|
July 9, Sarasota
To fix severe design and construction flaws that have caused a key concrete support to fail, engineers plan to jack up the 15-story Dolphin Tower like a car with a flat tire. Lifting the fourth-floor concrete support is critical to fully stabilize the 117-unit downtown condominium building, an engineer hired to salvage the structure told a crowd of residents…more
|
Tags: