|
 |
|
Building Information Modeling Working Group
The purpose of this working group is to enable a forum about the challenges and opportunities central to Building Information Modeling in the design and construction of tall buildings. |
|
 |
|
Façade Access Working Group
The goal of the Façade Access Working Group is to increase awareness about issues of accessing and maintaining tall buildings, and how to better integrate these systems with architectural design.
|
|
 |
|
Fire & Safety Working Group
This working group is concerned with leading the industry, globally, towards a consensus on designing safe buildings, taking account of modern forms of risk, when and where appropriate.
|
|
 |
|
Foundations Working Group
Foundation and building behaviour is highly interactive, with movements of the foundation resulting from the building loads, and these movements in turn influencing the behaviour of the building...
|
|
 |
|
Height Committee
The CTBUH is the arbiter of the criteria upon which tall building height is measured, and thus the title of “The World’s Tallest Building” determined. The Height Committee, composed of prominent international professionals meets regularly to accurately maintain these criteria.
|
|
 |
|
Legal Aspects of Tall Buildings Working Group
This working group combines the inextricably linked areas of planning and construction and will report on legal issues and trends on planning and procurement.
|
|
 |
|
Outriggers Working Group
Outrigger systems have been widely used in super tall buildings constructed since the 1980’s, eclipsing the tubular frame systems previously favored. However, the outrigger system is not listed as a seismic lateral load resisting system in any code, and design guidelines are not available...
|
|
 |
|
Research, Academic and Postgraduate Working Group
This working group aims to bring together all those who are undertaking formal, funded research in multi-disciplinary aspects of tall buildings internationally. The group aims to help coordinate that research, maximize output and analyse research gaps and possible future funding opportunities...
|
|
 |
|
Seismic Design Working Group
There is a resurgence in the construction of high rise buildings around the world, including in many seismically active regions. This working group released a guide in 2008 that sets out best practice for the seismic design of high-rise buildings for use in any seismic region of the world...
|
|
|

|
|
Sustainability Working Group
This working group sets out to define and investigate the many aspects of the oft-used word ‘sustainability’, in the context of tall buildings. In doing this, it sets out to dispel the myths associated with sustainability and determine exactly what the issues are and how they can be addressed....
|
|
 |
|
Wind Engineering Working Group
The main structure of a tall building and its façade must be designed to safely withstand the extreme winds that the building will be subjected to during its expected life. An important part of achieving this is determining what the wind loads will be for specific mean recurrence intervals and what the uncertainties are in these loads.
|
|
 |
|
Young Professionals Committee
The Young Professionals Committee was created to be an incubator for the next generation of CTBUH leaders. It connects young members with established leaders within CTBUH to provide great mentorship and collaboration opportunities.....
|